Frontline – Shankill, Dublin

One of our Rehabilitation Teams was on site in Shankill, Dublin this week. The job on behalf of Irish Water involved the installation of 29 CIPP patches to 525mm pipes to prevent Root Infiltration on a main truck sewer which runs to a pumping station. Further works will require the installation of 180m of UV CIPP liner to the same stretch of pipe. The McAllister Group is one of the foremost specialists in the application of CIPP applications on the island of Ireland and Great Britain. Cured-In-Place Pipe is one of a number of Trenchless Solutions offered by the Group. Use of Trenchless or No-Dig applications does not require excavation to rehabilitate a pipeline that is either leaking or structurally unsound. When cured it can extend the lifespan of a pipe by as much as 75 years.